ALG-1
facing with panels made of aluminum sheet, the sub construction is made of aluminum profile System ALG-1 (invisible fastening) is not very different from the system GVS-1. The facing material as a rule is aluminum and composite panels of various sizes, from 500х500; 500х800 mm up to 1200х2400. Manufacturing panels on the order is possible. Thickness of the used facing material is within the limits of 1,5 - 3 mm - for aluminum panels and cartridges, and from 4 up to 6 mm for composite facing materials.Aluminum panels are a very light facing material, the weight of which is from 4 kg / square meter. Panels are painted any color on RAL, or are anodized. Composite materials (Alucobond, Alucomp, Architeks, Goldstar, and etc.) are made by manufacturers already with the decorative covering PVDF.Panels used in the system ALG-1 are resistant enough to the atmospheric precipitation and are not subject to corrosion. Guarantee certificates which are given by the manufacturer on the...
GAL
facing of facade with cemento-fibrous plates, sub construction made of aluminum profile This system is designed for the plates made of fibrocement (Minerit, CemColor, CemStone) and asbestocement (CraspanColor, CraspanStone). Sub construction is executed of aluminum alloys. The air backlash between the thermo insulation and facing allows deleting effectively the moisture and the condensate which has no opportunity to concentrate on the surface. Air streams in the ventilation clearance space (the temperature of which is 2-3°С higher than the environment) quickly move upward in the air interval, thus keeping the walls in a dry condition. The fastening of plates is made in a visible way - with the acid-resistant screws painted the color of plates. The plates are cold-resistant and weatherproof. Combining the plates of different color and shape we receive beautiful impressive facades. Different colors and materials especially emphasize the architectural lines of the building and its...
GF-e1
facing the facade with cementofibrous plates, the sub construction is made of the steel zinced profile System GF-e1 is the first system which has appeared in the construction market of Russia. It is applied to face the walls of the buildings with the plates made of fibrocement, widely known as Minerit, CemColor, CemStone and of asbestocement produced by association "Craspan" - CraspanStone and CraspanColor. The idea of the system is the same: bearing arms, vertical and horizontal directing beams. The system is made of zinced steel or of aluminum alloys. The fastening of facing plates to the directing beams is complete, that is visible, and is made with the acid-resistant screws painted the color of plates. For this system there is a restriction on the height of application - buildings up to 45 m high as the facing plates have big subjection to the wind.
GNC-1 & GNC-2
facing of facade with ceramic granite, aluminum sub construction, invisible fixture The facades executed with the application of invisible system of fastening have a more aesthetic look. The developed system GNC-1 meets these requirements. Bearing arms are the analogues of those used in the system GVC-1, and the directing beams have a significant difference - they are made without the sealing profile. On the vertical directing beams the horizontal directing beams are installed, to which the facing material is fixed later. The horizontal directing beams provide a more uniform distribution of loadings from the system to the bearing walls of a building. When using the invisible system of fixture an additional operation is required - to make blank apertures in the facing material from the inside. This operation is made to install the backfilling anchors with the help of which the facing material is directly fixed to the horizontal directing beams. The system is recommended for...
GVC-1 & GVC-2
facing of facade with ceramic granite, aluminum sub construction, visible fixture System GVC-1 is widely applied as an optimum way to perform the works on the buildings with the tiles of ceramic granite 300х300 mm, 600х600 mm, 600х300 mm, 600х1200 mm with visible fixture. The height of the building should not exceed 45 m. On the basis (the walls of the building) arms are mounted which are the first bearing element of the construction. Installation is carried out with the help of the anchor concrete inserts and through the thermo insulation linings. In the system the Т-shaped profile is used - the second bearing element is installed on the arms complimented by the sealing profiles. The sealing profile provides soft and at the same time firm contact of the facing material to the bearing profile. Next direct installation of a facing tile on metal sub construction is made with the help of various units of visible fastening. the assembly diagram of a straight part of a...